TT11 - Total Kharir CCU Extention Project
|
Client
TOTAL E&P Yemen
Duration
2009-10-01 - 2010-09-30
Engineering, Procurement & Construction (EPC) In 2005, the Central Compression Unit (CCU) project has been launched in order to gather the GAS from basement wells in one facility to enable a proper gas re-injection inside the basement reservoir.
- The Boosting Package within the CCU comprises:
- Update of the control, ESD, F&G systems in the existing CCU technical building.
- Installation of the 400V MCC and connection of all the equipments to this MCC.
The AS&AF Package within the CCU:
- 2# Oil booster pumps (2x100%, 45 000 blpd each)
- 1# pig launcher on the CCU
- 1#26" Oil inlet manifold
- 1# new closed drain vessel
- 1# new technical building
- 1# Fire water tank
- Installation of the 6.6kV MCC Switchboard
- Installation of 400w/6.k KV transformers.
- Installation of the 400V MCC
- 1#5 km12" Pipeline between CCU and the CPU.
|
|
|
|
|
|
|
|